The Yangebup Lake is part of the eastern chain of the Beeliar Wetlands, managed by the City of Cockburn. As a result of past land uses such as farming and residential development, the lake’s water quality declined, and nutrient imbalances developed. BWC was then part of the solar-powered nutrient stripping project to rehabilitate the lake.
During this project, BWC was involved in:
- Survey and set out of the project site
- Clearing the site area
- Removal and disposal of organic matter from the site
- Detailed earthworks and excavation of 2 individual nutrient stripping basins
- Excavation and installation of the storm water drainage components